Γραμμή παραγωγής κυματοειδούς σωλήνα DWCP

διπλό τοίχωμα κυματοειδούς σωλήνα
July 24, 2025
Brief: Discover the advanced HDPE PP Double Wall Corrugated Pipe Production Line, designed for water supply and drainage systems. This high-speed, water-cooled system produces lightweight, durable pipes with excellent impact and corrosion resistance. Perfect for urban drainage, agricultural irrigation, and cable laying applications.
Related Product Features:
  • High-speed water-cooled corrugated pipe manufacturing system using PP or HDPE raw materials.
  • Produces both single-wall and double-wall corrugated pipes with superior durability.
  • Lightweight pipes with excellent impact resistance and robust corrosion resistance.
  • Suitable for urban drainage, water supply systems, and agricultural irrigation.
  • Eco-friendly design reduces material use while maintaining strength.
  • Horizontal large-diameter corrugated pipe technology ensures uniform wall thickness.
  • Closed-loop water cooling reduces energy consumption by 30%.
  • Smooth interior and trapezoidal corrugated exterior for 40% higher ring stiffness.
Ερωτήσεις:
  • What materials are used in the HDPE PP Double Wall Corrugated Pipe Production Line?
    The production line primarily uses polypropylene (PP) or high-density polyethylene (HDPE) as its main raw materials.
  • What are the key advantages of the pipes produced by this line?
    The pipes are lightweight, offer excellent impact resistance, robust corrosion resistance, and superior cold and heat resistance.
  • What applications are these pipes suitable for?
    The pipes are versatile and suitable for urban drainage, water supply systems, agricultural irrigation, cable laying, and renewable energy projects.
Σχετικά βίντεο

μηχανή διπλού τοιχώματος για σωλήνες

διπλό τοίχωμα κυματοειδούς σωλήνα
April 28, 2025

Διπλοτειχισμένος

διπλό τοίχωμα κυματοειδούς σωλήνα
April 01, 2025

Η γραμμή παραγωγής προ-μονωμένων σωλήνων PUR Spray PE Wrap

Προϊσοποιημένη γραμμή παραγωγής σωλήνων
April 27, 2025

Διάταξη εκτόξευσης σωλήνων pE 150KW

Προμονωμένη γραμμή σωλήνων
April 25, 2024