Εσωτερική Εξωτερική Γραμμή Παραγωγής Σωλήνων με Επίστρωση 3LPE με Σύστημα Λειτουργίας Οθόνης Αφής και Επίπεδο Καθαρισμού SA2.5

Γραμμή παραγωγής σωλήνων επικάλυψης 3LPE
July 31, 2025
Brief: Discover the Automatic 3LPE Coating Pipe Production Line with Touch Screen Control, designed for high-quality 3PE/3LPE/FBE Coated Steel Pipes. Featuring SA2.5 cleaning level, PLC control system, and a PE layer thickness of 2.5-3.7mm, this production line ensures superior corrosion resistance and durability for pipes ranging from 200mm to 1400mm in diameter.
Related Product Features:
  • Advanced touch screen operating system for easy control and monitoring.
  • Three-layer Polyethylene Coating (3LPE) with PE layer thickness of 2.5-3.7mm.
  • SA2.5 cleaning level ensures excellent adhesion and surface preparation.
  • PLC control system for precise and efficient operation.
  • Capable of producing pipes with diameters from 200mm to 1400mm.
  • Automatic method type for consistent and high-quality production.
  • Suitable for internal and external pipe wall coating applications.
  • Heating temperature range of 220-250℃ for optimal coating performance.
Ερωτήσεις:
  • What types of coatings can this production line apply?
    This production line is designed for 3PE/3LPE/FBE Coated Steel Pipes, including Three-layer Polyethylene Coating and Ceramic Enamel Coated Steel Pipes.
  • What is the cleaning level of the production line?
    The production line features an SA2.5 cleaning level, ensuring thorough surface preparation for excellent coating adhesion.
  • What is the diameter range of pipes this production line can handle?
    The production line can handle pipes with diameters ranging from 200mm to 1400mm, making it versatile for various industry requirements.
Σχετικά βίντεο

εσωτερική υγρή επίστρωση

Γραμμή παραγωγής σωλήνων επικάλυψης 3LPE
December 17, 2025

3lpe

June 07, 2024

Μηχανή παραγωγής προμονωμένων μανδύων PE

Προμονωμένη γραμμή σωλήνων
December 11, 2024

Θερμοσυστελλόμενο μανίκι

Θερμοσυστελλόμενο μανίκι
March 15, 2024

Διάταξη εκτόξευσης σωλήνων pE 150KW

Προμονωμένη γραμμή σωλήνων
April 25, 2024